Pages

Jumat, 11 Maret 2016

The Shop Tour Series Part I

For anyone who’s been reading along (or listening to me go on about it on the MWA Podcast), you know that I’ve been working on the shop for a long time. When I got home from Woodworking in America 2011 I went right to work on my bench (for about a month). Then it got cold and I’ve been working on my shop renovation since (with plenty of project interruptions).
I’m currently in what I call Phase 1 of the the renovation. It is the wiring, insulation and sheathing of the two (2) exterior walls. The remaining phases, as I envision them now, are as follows:Phase 1.5 Insulate and Sheath the FloorPhase 2 Bump out the back wallPhase 3 Cathedral the ceilingAs I’m hoping to accomplish a lot in the shop this year, I thought it would be interesting and motivating to document it on a regular basis. So, I’m going to film a shop tour each month. For this first one (1), I spend a bit of time just going over the shop. In the future I’ll try to focus on what has changed.Here is the premier: 2013 January Shop Tour

Related Posts by Categories

0 komentar:

Posting Komentar

 
Working down in the trenches during the early days of shop renovation.