Pages

Selasa, 09 Februari 2016

Hall Tree assembly part 1

I started assembly on the Hall Tree last night.  I ran into some unexpected problems so I didnt get as much done as I had hoped to.
I started with the rear backsplash for the shelf at the top.  This one went pretty well.  I used my
Rockler Clampit and it did a good job.
This is the bottom with the apron in the front.  Since the pocket holes are on the inside I put the Clampit on the outside.  In hindsight I should have put the clamps all the choice to the inside of the Clampit.  I had put them further out to allow me to get the drill to the pocket hole but I think putting the clamps all the choice inside would have worked better.  The wood ended up drifting and one of the screws split the edge of the front corner.
I forced some glue into the split and clamped it and you can barely tell now.  I just need to do some sanding and after I paint it you will never know.
I got the top shelf mounted, glued and screwed in and I was very happy with the result.
Only the top shelf, backsplash, and bottom front apron are actually attached.  I dry fit the rest to see how it looks.  I hope to get the rest of it assembled tonight.
?
?

Related Posts by Categories

0 komentar:

Posting Komentar